What Are the Main Processes of Project Management?

Table of Contents
    Add a header to begin generating the table of contents

    Project management is a crucial element for any organisation's success, be it small or large. It involves the coordination of various activities and processes to ensure the project's completion within the defined scope, time, and budget. But have you ever wondered what the main processes of project management are? If you're curious to know, keep reading!

    In short, the main processes of project management in Australia include initiating, planning, executing, monitoring and controlling, and closing. These processes are further divided into various sub-processes, such as defining project goals, creating a work breakdown structure, identifying project risks, monitoring project progress, and conducting project evaluations. All these processes are essential for the successful completion of a project.

    If you want to know more about project management processes in Australia, you've come to the right place! In this article, we'll dive deeper into each of the processes, exploring their significance and giving examples of how they can be implemented. We'll also discuss some best practices and tips for successful project management. So, fasten your seatbelts, and let's get started!

    Quick Links To Online Project Management Degrees

    Edith Cowan University

    Graduate Certificate of People in Project Management Online

    • 6 months (minimum) part-time
    • 3 Units
    • $13,020 FEE-HELP available

    RMIT Online

    Agile For Project Management

    • 6 weeks (5-8 hours per week)
    • $1,600 incl. GST
    • Start Date: 10 Jul 2023

    Southern Cross University

    Master of Project Management Online

    • 2 years part-time
    • 12 Units
    • Affordable fees, FEE-HELP available

    Introduction

    The management of projects is an essential procedure that is employed in a wide variety of businesses and organisations throughout Australia. It entails a series of tasks that assist project managers in planning, executing, and controlling projects, ensuring that they accomplish their objectives and are finished within the time and money constraints that were allotted. 

    The management of a project is one of the most important factors determining whether or not it will be successful, and it necessitates thorough preparation, open communication, and cooperative effort among all stakeholders.

    Initiating Process Group

    Defining a new project or a new phase of an existing project falls under the purview of the first stage of the project management process, which is known as the initiating process group. This stage is extremely important since it creates the groundwork for the entirety of the project and outlines its objectives, aims, and scope.

    Project managers and stakeholders collaborate during the initiating process group to create a project charter. This document specifies the project's purpose, objectives, and high-level requirements. The project charter is an important document that acts as a point of reference for decision-making and directs the work of the project team for the entirety of the project's life cycle.

    The group that is responsible for launching the process is responsible for identifying key stakeholders and getting those stakeholders involved in the project. This includes determining stakeholders' requirements, expectations, and concerns, as well as designing a communication plan that will keep stakeholders informed and involved for the entirety of the project.

    The initiating process group is responsible for performing a feasibility study in addition to the project charter and the involvement of stakeholders. The purpose of the research is to assess whether or not the project is viable and whether or not it matches the organisation's strategic goals. This may entail carrying out a cost-benefit analysis, completing a risk assessment, and evaluating the viability of the project from a technical and operational standpoint.

    The beginning process group is an extremely important component in laying the groundwork for a fruitful undertaking. It lays out the purpose, objectives, and scope of the project, involves key stakeholders, and examines the project's viability to ensure that it corresponds with the organisation's strategic goals.

    Planning Process Group

    The second stage of project management is called the planning process group, and its primary responsibility is to create an all-encompassing plan for the project. This stage is essential because it lays the foundation for how the project will be carried out, monitored, and managed in the subsequent stages.

    During the group phase of the planning process, project managers collaborate with the project team to establish a comprehensive plan for the project. This plan will contain a statement of the project's scope, as well as a budget, a timetable, and a risk management strategy. 

    While the project schedule covers the project's timing and critical path, the project scope statement outlines the project's limits, deliverables, and requirements. In addition, the project scope statement outlines what will be required to complete the project.

    The budget is an important part of the strategy for the project, and it includes estimates for all of the expenditures that are associated with the project, such as labour, materials, and overhead expenses. Additionally, the budget allots funds to serve as a reserve in case any unanticipated dangers or events turn out to have an adverse effect on the project.

    The planning process group will also be responsible for designing a strategy for risk management. This is an additional key feature. This comprises identifying possible risks that have an effect on the project, evaluating the likelihood and impact of each risk, and implementing solutions to reduce or avoid the risks that have been identified.

    The planning process group may also contain the following, in addition to these essential components: the development of a communication strategy to keep stakeholders informed, the identification of the roles and responsibilities of the project team, and the establishment of project management processes and procedures.

    what are the 9 hr competencies 2

    Executing Process Group

    The third stage of project management is the executing process group, and its primary responsibility is carrying out the project plan. This stage is very important since it is at this stage that the project team really puts the plan for the project into action and produces the deliverables for the project.

    Project managers are responsible for monitoring and ensuring that the project team finishes all of the project's tasks, work packages, and deliverables in accordance with the project plan when they are working on the executing process group. This may require collaborating with different vendors, managing available resources, and addressing any possible difficulties or hazards.

    During the entire project, the executing process group is responsible for ensuring that all of the project's stakeholders are kept up-to-date and actively involved. Providing frequent project progress reports, holding meetings with stakeholders, and addressing any issues or suggestions they may have are all potential steps in this direction.

    Managing the project's finances and timetable is an additional significant component of the executing process group's responsibilities. The project manager is responsible for ensuring that the work is finished within the allotted budget and within the specified amount of time and that any changes or deviations from these parameters are properly documented and received approval.

    In addition to these essential components, the executing process group may also comprise quality control and assurance processes. These procedures, which may include things like carrying out inspections or audits, are designed to guarantee that the deliverables of the project are in accordance with the requirements and specifications of the project.

    Monitoring and Controlling Process Group

    The monitoring and controlling process group is the fourth stage in the project management process. This stage entails monitoring the development and performance of the project to ensure that it remains on track and achieves its goals. This stage is essential because it enables project managers to identify and address any issues or risks that may come up while the project is being carried out, which can help them better manage the project.

    Project managers make use of a wide variety of tools and methods throughout the monitoring and controlling process group in order to track and analyse the performance of the project in comparison to the plan for the project. This may entail keeping an eye on the timeline, budget, quality, and risk management strategy for the project, in addition to doing performance evaluations and submitting progress updates.

    The group responsible for monitoring and controlling the process is responsible, among other things, for determining whether the project will be successful and coming up with solutions to any problems or threats that may arise. This may include making changes to the project plan, modifying the project timeline or budget, or applying new procedures for risk management.

    The monitoring and controlling process group is responsible for ensuring that project stakeholders are kept informed of the progress of the project as well as any issues or risks that may arise. This is an extremely important aspect of the group's work. This may entail producing frequent project status reports and having meetings with stakeholders to discuss any issues or input they may have. Also included in this may be the provision of regular updates on the project.

    In addition to these essential components, the monitoring and controlling process group may also include the implementation of change management processes to manage any changes or deviations from the project plan, as well as the conduct of quality control and assurance processes to guarantee that the project's deliverables are in accordance with the project's requirements and specifications.

    In general, the monitoring and controlling process group is important for ensuring that the project continues in the intended direction and achieves its goals. Throughout the life cycle of the project, it is necessary to keep stakeholders informed and engaged, track and analyse the project's performance, identify and address any issues or risks that may arise, and track and analyse the project's performance.

    Closing Process Group

    The last step of project management is called the closure process group, and its responsibilities include officially wrapping up the project. This stage is essential since it guarantees that all of the project's activities will be finished and that the project's goals will be accomplished.

    Project managers are responsible for carrying out a variety of tasks throughout the closure process group in order to formally bring the project to an end. This may involve carrying out a final evaluation of the project, keeping a record of any lessons learnt, and ensuring that all project deliverables have been finished and authorised.

    Conducting a final review or evaluation of the project is one of the most important aspects of the closure process group. This comprises assessing the project's goals and deliverables to see whether or not they have been met, as well as determining whether or not the project was finished within the allotted amount of money and the specified amount of time.

    The documentation of any lessons learnt from the project is another significant component of the group responsible for the closure process. This may entail recording what went well throughout the project, any problems or issues encountered, and how they were addressed. In addition, this may involve documenting what went well during the project. This knowledge may be put to use to enhance the procedures and practises of project management for future projects.

    In addition to these essential components, the closure process group may also be responsible for transferring the deliverables of the project to the project sponsor or end-users, as well as carrying out any necessary administrative duties, such as concluding contracts or receiving final permissions.

    teenager russian student girl isolated on purple background holding copyspace imaginary on the palm to insert an ad

    Project Management Methodologies

    The process of managing projects might benefit from more direction and organisation thanks to applying various project management approaches. They are used to specify the procedures, methods, instruments, and responsibilities required to carry out a project effectively. Choosing the appropriate approach is essential since it may play a key role in determining whether or not the project is successful.

    Waterfall, Agile, Scrum, Lean, Six Sigma, PRINCE2, and PMBOK are the project management approaches that are utilised the most frequently nowadays.

    • Waterfall Methodology: The Waterfall methodology is a sequential project management approach that follows a linear, step-by-step process. The project is divided into distinct phases, with each phase completed before moving on to the next. This methodology is commonly used in construction, engineering, and manufacturing industries. Waterfall is well-suited to projects with well-defined requirements, a clear project scope, and a predictable schedule.
    • Agile Methodology: Agile is an iterative project management methodology that is focused on delivering value incrementally and continuously. This methodology is particularly popular in software development and other IT-related projects but can be used in a wide range of industries. Agile emphasises flexibility, collaboration, and responding quickly to changing requirements. It involves breaking the project down into smaller, more manageable components known as sprints.
    • Scrum Methodology: Scrum is a subset of Agile methodology that is particularly well-suited to complex projects with rapidly-changing requirements. It is centred around a small, cross-functional team that works together to deliver working software in short iterations, known as sprints. Scrum emphasises teamwork, collaboration, and continuous improvement.
    • Lean Methodology: Lean project management is focused on maximising value while minimising waste. This methodology is commonly used in manufacturing and production environments, where efficiency and cost reduction are key priorities. Lean project management involves identifying and eliminating non-value-adding activities, streamlining processes, and improving overall efficiency.
    • Six Sigma Methodology: Six Sigma is a data-driven project management methodology that is focused on reducing defects and improving quality. It is often used in industries such as manufacturing and healthcare, where quality control is critical. Six Sigma involves identifying and eliminating the root causes of defects, as well as reducing process variation.
    • PRINCE2 Methodology: PRINCE2 (PRojects IN Controlled Environments) is a process-based project management methodology that emphasises project planning, monitoring, and control. It is well-suited to complex projects with multiple stakeholders and high levels of risk. PRINCE2 involves clearly defining roles and responsibilities and using best practices for project planning and execution.
    • PMBOK Methodology: The Project Management Body of Knowledge (PMBOK) methodology is a framework that outlines best practices and standards for managing projects. It provides guidance on project initiation, planning, execution, monitoring, and control. PMBOK is widely recognised as the industry standard for project management and is often used as a reference guide for project managers.

    It is crucial to keep in mind that different project management techniques are not incompatible with one another. As a result, it is usual practice for project managers to employ a combination of methodologies or to adapt existing approaches to meet the requirements of their specific project. Choosing a technique that is appropriate for the project's scope, objectives, and needs is the most important step in the process.

    In a nutshell, project management techniques are frameworks that offer advice and structure for the administration of projects. There is a wide variety of approaches that may be taken, and each one has its own set of advantages and disadvantages. 

    Project managers may enhance their chances of success and execute projects that meet or exceed the expectations of stakeholders if they understand these approaches and select the one that is best suited for their project.

    Benefits of Effective Project Management

    For companies and other types of organisations, efficient project management provides a variety of benefits, including the following:

    • Improved efficiency: Effective project management helps streamline processes and improve efficiency, leading to cost savings and increased productivity.
    • Clearer communication: Project management requires clear communication between team members, stakeholders, and project managers. When communication is effective, it can help to avoid misunderstandings and delays.
    • Better risk management: Project managers are responsible for identifying and mitigating risks throughout the project lifecycle. This helps to minimise the impact of unexpected events and keeps the project on track.
    • Improved stakeholder satisfaction: Effective project management ensures that stakeholders are kept informed throughout the project and that their needs and expectations are being met. This can lead to greater stakeholder satisfaction and a better outcome for the project overall.
    • Enhanced quality: Project management helps to ensure that projects are delivered to a high standard, with quality control measures in place to catch any errors or defects.
    • Greater agility: Effective project management enables teams to respond to changing circumstances and adapt to new challenges as they arise. This helps to ensure that projects remain on track even in the face of unexpected setbacks.
    • Increased team collaboration: Project management promotes collaboration among team members, which can lead to better problem-solving and more innovative solutions. When team members work together effectively, they can leverage each other's strengths and skills to achieve better outcomes.
    • Improved decision-making: Effective project management requires a structured approach to decision-making, with clear criteria and processes in place for evaluating options. This can help to ensure that decisions are based on sound reasoning and analysis rather than gut feelings or intuition.
    • Better resource allocation: Project management helps to ensure that resources are allocated effectively, with a focus on achieving the project's goals and objectives. This can help to prevent waste and ensure that resources are used in the most efficient way possible.
    • Increased accountability: Project management establishes clear roles and responsibilities for team members, which can help promote accountability and ensure everyone is working towards the same goal. When team members know what is expected of them, they are more likely to take ownership of their work and deliver high-quality results.
    • Improved project outcomes: Effective project management can help to ensure that projects are completed on time, within budget, and to a high standard. This can lead to better outcomes for the project overall, as well as improved customer satisfaction and a stronger reputation in the marketplace.
    • Increased stakeholder engagement: Project management helps to ensure that stakeholders are engaged throughout the project, with regular updates and opportunities for feedback. This can help build trust and confidence among stakeholders and ensure their needs and expectations are met.

    Challenges of Project Management in Australia

    The management of projects in Australia has a variety of issues that are particular to the country, including the following:

    • Cultural differences: Australia is a diverse country with a range of cultures and backgrounds. This can create challenges when it comes to communication and working together effectively on projects. Project managers must be sensitive to cultural differences and find ways to ensure everyone is on the same page.
    • Geographic isolation: Australia is a large country with a relatively small population. This means that many projects are located in remote areas, which can make it difficult to access resources and talent. Project managers need to work effectively in remote locations and find ways to manage teams spread out across the country.
    • Regulatory requirements: Australia has a complex regulatory environment, with a range of laws and regulations that need to be adhered to. This can make project management more challenging, as project managers must ensure that their projects comply with all relevant regulations.
    • Economic volatility: Australia's economy is highly dependent on commodity prices, which can be volatile. This means that project managers need to be able to adapt to changing economic conditions and be prepared for potential budget constraints.
    • Environmental concerns: Australia is home to a diverse range of ecosystems and wildlife, which large-scale projects can impact. Project managers need to be aware of these environmental concerns and find ways to minimise their impact on the environment.

    In general, the management of projects in Australia calls for a high level of adaptation and resilience in order to successfully navigate the one-of-a-kind obstacles that are there. Those who are able to effectively manage these problems as project managers are in a strong position to prosper in the competitive business climate that exists in Australia.

    Conclusion

    In conclusion, project management is an essential step for any individual or group that wishes to realise their ambitions and become successful. It entails carrying out a number of processes and procedures to guarantee that projects are finished on time, without going over their allotted budget, and to the satisfaction of the stakeholders.

    The primary phases of project management are initiating, planning, carrying out, monitoring and controlling, and finally closing down a project. During the initiation phase, you will define the project's scope, objectives, and stakeholders. During the planning phase, you will develop a project strategy, a schedule, and an allocation of resources. 

    The actual carrying out of the tasks outlined in the project plan is what is meant by "execution." Tracking progress, detecting and mitigating risks, and making required modifications are all part of the monitoring and control process. Bringing a project to a successful conclusion requires finishing off all of its associated operations and delivering the completed good or service.

    Which approaches have you discovered to be the most successful in managing projects? Leave a comment below and tell us about your experiences!

    Content Summary

    • Project management is a crucial element for any organisation's success, be it small or large.
    • In short, the main processes of project management in Australia include initiating, planning, executing, monitoring and controlling, and closing.
    • These processes are further divided into various sub-processes, such as defining project goals, creating a work breakdown structure, identifying project risks, monitoring project progress, and conducting project evaluations.
    • All these processes are essential for the successful completion of a project.
    • The second stage of project management is called the planning process group, and its primary responsibility is to create an all-encompassing plan for the project.
    • During the group phase of the planning process, project managers collaborate with the project team to establish a comprehensive plan for the project.
    • This plan will contain a statement of the project's scope, as well as a budget, a timetable, and a risk management strategy.
    • The planning process group may also contain the following, in addition to these essential components: the development of a communication strategy to keep stakeholders informed, the identification of the roles and responsibilities of the project team, and the establishment of project management processes and procedures.
    • The third stage of project management is the executing process group, and its primary responsibility is carrying out the project plan.
    • In addition to these essential components, the executing process group may also comprise quality control and assurance processes.
    • The monitoring and controlling process group is the fourth stage in the project management process.
    • Project managers make use of a wide variety of tools and methods throughout the monitoring and controlling process group in order to track and analyse the performance of the project in comparison to the plan for the project.
    • The monitoring and controlling process group is responsible for ensuring that project stakeholders are kept informed of the progress of the project as well as any issues or risks that may arise.
    • In addition to these essential components, the monitoring and controlling process group may also include the implementation of change management processes to manage any changes or deviations from the project plan, as well as the conduct of quality control and assurance processes to guarantee that the project's deliverables are in accordance with the project's requirements and specifications.
    • Throughout the life cycle of the project, it is necessary to keep stakeholders informed and engaged, track and analyse the project's performance, identify and address any issues or risks that may arise, and track and analyse the project's performance.
    • The last step of project management is called the closure process group, and its responsibilities include officially wrapping up the project.
    • Project managers are responsible for carrying out a variety of tasks throughout the closure process group in order to formally bring the project to an end.
    • This may involve carrying out a final evaluation of the project, keeping a record of any lessons learnt, and ensuring that all project deliverables have been finished and authorised.
    • Conducting a final review or evaluation of the project is one of the most important aspects of the closure process group.
    • The documentation of any lessons learnt from the project is another significant component of the group responsible for the closure process.
    • This knowledge may be put to use to enhance the procedures and practises of project management for future projects.
    • The process of managing projects might benefit from more direction and organisation thanks to applying various project management approaches.
    • Agile is an iterative project management methodology that is focused on delivering value incrementally and continuously.
    • Scrum is a subset of Agile methodology that is particularly well-suited to complex projects with rapidly-changing requirements.
    • Lean project management is focused on maximising value while minimising waste.
    • Six Sigma is a data-driven project management methodology that is focused on reducing defects and improving quality.
    • The Project Management Body of Knowledge (PMBOK) methodology is a framework that outlines best practices and standards for managing projects.
    • In a nutshell, project management techniques are frameworks that offer advice and structure for the administration of projects.
    • Effective project management helps streamline processes and improve efficiency, leading to cost savings and increased productivity.
    • Project management requires clear communication between team members, stakeholders, and project managers.
    • Project management establishes clear roles and responsibilities for team members, which can help promote accountability and ensure everyone is working towards the same goal.
    • Effective project management ensures that projects are completed on time, within budget, and to a high standard.
    • Australia is a diverse country with a range of cultures and backgrounds.
    • Project managers must be sensitive to cultural differences and find ways to ensure everyone is on the same page.
    • In general, the management of projects in Australia calls for a high level of adaptation and resilience in order to successfully navigate the one-of-a-kind obstacles that are there.
    • Those who are able to effectively manage these problems as project managers are in a strong position to prosper in the competitive business climate that exists in Australia.
    • In conclusion, project management is an essential step for any individual or group that wishes to realise their ambitions and become successful.
    • It entails carrying out a number of processes and procedures to guarantee that projects are finished on time, without going over their allotted budget, and to the satisfaction of the stakeholders.
    • The primary phases of project management are initiating, planning, carrying out, monitoring and controlling, and finally, closing down a project.
    • During the initiation phase, you will define the project's scope, objectives, and stakeholders.
    • During the planning phase, you will develop a project strategy, a schedule, and an allocation of resources.
    • The actual carrying out of the tasks outlined in the project plan is what is meant by "execution."
    • Bringing a project to a successful conclusion requires finishing off all of its associated operations and delivering the completed good or service.

    FAQs About Project Management

    Project management is the process of planning, executing, monitoring, and controlling a project to achieve its objectives. Effective project management is essential for delivering value to stakeholders, reducing project costs, and improving project outcomes.

    The main stages of project management include initiating, planning, executing, monitoring and controlling, and closing.

    Some common project management methodologies used in Australia include Agile, Waterfall, and PRINCE2.

    Project management challenges in Australia include a shortage of skilled project managers, a lack of project management standards, and difficulties in managing cross-functional teams.

    Effective project management can deliver a range of benefits, including improved project outcomes, increased stakeholder satisfaction, and better alignment with organisational goals.